I'm in U.S. and would like to visit Shenzen. Where do I start?

Hi Violet!

Thank you for the answers so far!



Electronics companies

  1. Electronics Engineering firm to design a daughterboard with 7-port USB 3.0 Hub, USB Audio card, Audio amplifier, 3-port Gigabit Ethernet Switch, SAMD11D14 to control two stepper motors (pan/tilt). I expect a few working prototypes before starting manufacturing.
  2. Suppliers of the needed parts
  3. PCB Manufacturer and assembly once the above design is completed and proven. We’ll start with 100, then 500, then thousands.



    Enclosure companies
  4. Adapt the 3D printed enclosure that we have prototyped for injection mold process.
  5. We will start with silicone mold first.
  6. Then we will need production mold tooling.



    Custom cable companies
  7. We would like custom USB cables of various length and ends with molded strain relief.
  8. DC power cables of custom length with JST ends.
  9. Mains Power cable of various lengths.



    Custom Heatsink companies
  10. We would like to replace the factory shipped fan assisted heat sink on our motherboard and replace it with larger passive heat sink.
  11. We have tried working with some companies via email and chat, but I think being able to be in same room with the engineers would cut down the delays and misunderstandings.



    Thank you for all your help! I hope to see you in Shenzen!